St Julian's Physics Lab
Client: St Julian’s School
Site: St. Julian's School, Carcavelos, Portugal Contractor: Cool Haven, SA Architecture: Guilherme Murta Year: 2019 Size: 200m2 |
|
The Physics Laboratory was commissioned six years after the completion of the 1st projeto - the GreenHouse - to replace a prefabricated building located on the opposite side of a small lake.
The goal was to create a 100% functional building that could be directly accessed from the school gardens, with the unique feature of being fully dismantlable and later transformed into a complementary structure to be integrated into the school's overall master plan.
The building was partially built off-site, and the on-site assembly took 6 weeks. They will be relocated in the near future.
The goal was to create a 100% functional building that could be directly accessed from the school gardens, with the unique feature of being fully dismantlable and later transformed into a complementary structure to be integrated into the school's overall master plan.
The building was partially built off-site, and the on-site assembly took 6 weeks. They will be relocated in the near future.